Ä¢¹½´«Ã½

Three workmen, wearing high-visibility clothing attending to sea defences defects; Balfour Beatty carryout seawall repairs to the coastal defences wave reflection wall in Thorton Cleveleys. Engineers from a construction company accused by local councillors of botching the four-year scheme in Blackpool, which cost £27.1m, after gaps formed between sections of the concrete sea wall due to water damage and panels showing signs of erosion. Balfour Beatty said it was aware of water leaking from a joint between concrete sections towards the northern end of the Anchorsholme flood defence.

Three workmen, wearing high-visibility clothing attending to sea defences defects; Balfour Beatty carryout seawall repairs to the coastal defences wave reflection wall in Thorton Cleveleys. Engineers from a construction company accused by local councillors of botching the four-year scheme in Blackpool, which cost £27.1m, after gaps formed between sections of the concrete sea wall due to water damage and panels showing signs of erosion. Balfour Beatty said it was aware of water leaking from a joint between concrete sections towards the northern end of the Anchorsholme flood defence. Stock Photo
Preview

Image details

Contributor:

MediaWorldImages

Image ID:

P4G4ED

File size:

24.2 MB (1,005.2 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

3561 x 2374 px | 30.1 x 20.1 cm | 11.9 x 7.9 inches | 300dpi

Date taken:

22 June 2018

Location:

Cleveleys, Thornton-Cleveleys, UK

More information:

This image could have imperfections as it’s either historical or reportage.

"The design and construction of the sea defence wall has been a complex and challenging project."With any project of this size there can be additional work required to rectify any issues. "We must not lose sight of the huge benefits that the sea wall is providing and will deliver in the future... this significant project is reducing the flood risk to 4, 800 properties and businesses in Blackpool." Builder Balfour Beatty said it was "aware of the localised lifting of some concrete sea defence sections near to the northern tie-in with Cleveleys, resulting from the recent storms." It added there was no evidence of any risk to the rest of the sea defences

Available for Editorial use only.