engineers holding a pen pointing to a building and drawing outlay construction plan as guide for builders with details

RFID:Image ID:2C3HYGW
Image details
Contributor:
charnchai saehengImage ID:
2C3HYGWFile size:
68.3 MB (1.2 MB Compressed download)Releases:
Model - yes | Property - yesDo I need a release?Dimensions:
5982 x 3988 px | 50.6 x 33.8 cm | 19.9 x 13.3 inches | 300dpiDate taken:
22 March 2020Location:
ThailandMore information:
Access rights only. This is a handout or public domain image supplied by a third party. Ä¢¹½´«Ã½ grants access to the digital file but provides no warranties regarding copyright or moral rights. Alteration, modification, or cropping is prohibited without prior approval. All commercial uses require advance authorization from the content provider.