Ä¢¹½´«Ã½

workspace engineer, blueprint and tools on the desktop

workspace engineer, blueprint and tools on the desktop Stock Photo
Preview

Image details

Contributor:

Vitaliy Kytayko

Image ID:

2PM9GRG

File size:

34.9 MB (1.1 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4288 x 2848 px | 36.3 x 24.1 cm | 14.3 x 9.5 inches | 300dpi

Date taken:

29 May 2014

Location:

Ukraine